Planning the plumbing on my next keezer. I currently have a three port manifold with a threaded plug in the end. Would adding a secondary regulator be as easy as replacing the plug with a nipple and threading the secondary to it? I’d like to be able to run a lower pressure off the secondary regulator.
Thanks