In the processing of moving my brewing indoors and converting to electric. I have a single tier stand that I built based on the Brewtus 10 plans, so it’s a RIMS system with temperature controlled ASCO valves on the Mash Tun and HLT. Two March pumps (pump head removed in picture below). The system does not have that many batches on it as work and family gets between brewing and me, i.e. pumps still in great shape. All burners are banjo style burners. I am going to keep the pots for my electric system. Price is negotiable.
I am located in Farmington, MN.