Building Your Electric Brewery From Scratch (Complete Guide)

Fellow brewers,

The last few months I was working on my E-HERMS and control panel brewery build.

More information can be found on my blog.
https://skrilnetz.net/how-to-build-a-brewing-control-panel-herms-240v-30-amp/

I hope that this will help some people to make the move and brew electric.

Cheers!

Very nice!

Thanks a lot!

I LOVE the SSR power control. I’m in the middle of converting mine over from 110v to 220v. I am definitely going to incorporate this in my rebuild. Great idea, brother!!  8)

Just so I understand correctly, you’re not using a PID on the boil kettle. Just the regulator. I assume you crank it to 100% and then dial back after you get a good boil going?

Right, I use 100% till it boils and dial back to about 70% to keep a good boil.

You can do this on a PID also, just enable manual control.  Normally called ‘hand’.

Hi,

I’m happy to share my latest project with you.

This control panel is a multipurpose brewing controller. It’s powered by 240V / 30 AMP and can run 2 pumps and a 5500-watt heating element. It has a mash/boil controller with integrated timer and buzzer.

The AiONE controller does it all. BIAB, RIMS, or even a full-scale HERMS, this controller will handle it.
240V / 30 Amp, enough power for brewing batches up to 20 gallons
Very affordable
Controls 1 heating element and up to 2 pumps
Mash and Boil mode
Integrated timer and buzzer
Can be used with, or without a temperature sensor
Built with safety in mind
Easy to build
Check it out on my blog:
https://skrilnetz.net/the-all-in-one-brewing-control-panel/

AD1finalsmall_600-400.png